Photo of a wooden building with a red façade.
Photo of a wooden building with a red façade. © Fotografie Albrecht Voß

Client:
Erbe Elektromedizin GmbH

Completion:
2023

Location:
Rangendingen

Back to Projects

Elektromedizin Erbe, Rangendingen

Wolfer & Goebel, a company of the STRABAG subsidiary ZÜBLIN, built the new "Erbe 4.i" industrial complex in Rangendingen with the consortium partner SIEGLE+EPPLE.

The new building replaces the medical technology company’s existing premises and comprises three interconnected sections designed for different purposes: development, with a large atrium; production; and logistics.

The building complex meets the requirements of the KfW Efficiency House 40 EE standard.

Timber and timber-based materials were used for the load-bearing structure and parts of the façade. We carried out the timber construction work.

German press
ZÜBLIN company constructsindustrial building for medical technology ERBE
Start of timber construction work

View of the construction site

Impressions

  • Our services
    • Connection statics of the glulam roof structure
    • Workshop and assembly planning for the roof structure, for the timber-frame exterior walls and façade work, as well as the staircase structures and fixtures for the master office in LENO® cross laminated timber construction
    • Production, delivery and assembly
  • Products used

    LENO® cross laminated timber, glulam, timber frame exterior walls, timber façade

  • General planning

    io-consultants GmbH & Co KG

  • Client

    Erbe Elektromedizin GmbH, Rangendingen

  • ZÜBLIN Company

    Wolfer & Goebel Bau GmbH and SIEGLE+EPPLE in ARGE