Client:
Gartenstadt Karlsruhe
Construction period:
2010-2011
Location:
Karlsruhe
Garden city extension, Karlsruhe
Energy-efficient refurbishment, roof extension and construction of balcony extensions on a residential complex of eight buildings, as well as detailed weather protection planning. In the process, 24 additional apartments were added to 72 existing apartments by adding a new storey to the roof. A high degree of prefabrication was achieved thanks to the gypsum fiber cladding applied at the factory. LENO® cross laminated timber was used to strengthen the existing ceilings, which were not load-bearing.
We supplied SCHULZ Holzbau GmbH & Co. KG from Weingarten with the construction elements.
Impressions
-
Our services
- Production and delivery of ready-to-install wooden elements
-
Products used
LENO® cross laminated timber for ceilings above existing buildings, interior, exterior and apartment partition walls
-
Architectural office
Batz + Landbrecht Architects, Karlsruhe
-
Engineering office
Engineering office for structural analysis, Karlsruhe
-
Building owner
Garden City Karlsruhe
-
Client/executing carpentry
Schulz Holzbau GmbH & Co KG, Weingarten