Photo of the high school sports hall in Diedorf. Timber construction from the outside.
Photo of the high school sports hall in Diedorf. Timber construction from the outside. © Stefan Müller-Naumann

Client:
Landkreis Augsburg

Construction time timber construction sports hall:
8/2014 - 8/2015

Location:
Diedorf

Back to Projects

Gymnasium Diedorf

The single-storey sports hall was housed in a separate wing of the school complex.
We were responsible for the structural design, planning, manufacture and assembly of the timber elements, including the façade, for this sports hall.

Impressions

  • Our services
    • Statics, planning
    • Manufacture, delivery and installation of the timber elements and façade
  • Products used

    LENO® cross laminated timber, glulam, laminated veneer lumber, façade

  • Architectural office

    Architects Hermann Kaufmann ZT GmbH, Florian Nagler Architects

  • Client

    District of Augsburg