Photo of a timber building with timber and glass façade and flat roof.
Photo of a timber building with timber and glass façade and flat roof. © ZÜBLIN

Client:
Ed. Züblin AG, Lake Constance division, Langenargen

Completion:
2023

Location:
Langenargen

Back to Projects

New office building ZÜBLIN, Langenargen

For this project, we produced and supplied around 540m2 of LENO® cross laminated timber ceilings (300 mm thick) and 400m2 of LENO®-ADD exterior walls, including the timber façade.
In addition, 34m3 of glulam columns, which serve as a supporting structure, also find their place.

The LENO® elements and the glulam supporting structure remain visible so that the beautiful timber look can still be enjoyed after completion! Thanks to the high degree of prefabrication at the Aichach plant, the timber construction could be assembled within 30 days.

Impressions

View of the construction site

  • Our services
    • Connection statics of the glulam roof structure - delivery of timber construction support structure
    • Joinery glulam structure
    • Workshop and assembly planning
    • Manufacture and delivery of glulam supporting structure, LENO® cross laminated timber ceiling elements, LENO®-ADD exterior walls
  • Products used

    LENO® cross laminated timber, LENO®-ADD exterior walls

  • Architecture

    Ed. Züblin AG, Central Technology, 70567 Stuttgart

  • Client

    Ed. Züblin AG, Lake Constance Division, 88085 Langenargen