Client:
Ed. ZÜBLIN AG, ZÜBLIN Timber division
Construction period:
7/2023 - 10/2024
Location:
Aichach
New office building T3 in Aichach
Our new headquarters is a commitment to the Aichach location and a highly visible statement for timber construction and its potential.
The striking cubic, five-story administrative building, designed by the architectural firm MHM, was constructed on Industriestraße in close proximity to the factory halls. With a high proportion of wooden building materials and a renewable energy supply, the new building achieves Efficiency House Level 40 as well as the requirements of the EU taxonomy. A DGNB certification is being pursued for the construction site.
Together with the Augsburg division of ZÜBLIN's Ulm Directorate, we completed the wood-hybrid building as a general contractor in a turnkey manner. In doing so, a significant advantage of the chosen construction method became apparent: the short construction time. Thanks to the high degree of prefabrication of the wooden elements for ceilings, walls, and facade, the new building was completed after just 15 months of construction in October 2024.
German press:
Inauguration
Ground-breaking ceremony
A look at production
On the construction site
Impressions
-
Our services
- Turnkey construction of the new building; production, delivery and assembly of the timber elements for ceilings, walls and façade; timber frame construction walls
-
Products used
- LENO® cross laminated timber, glulam, facade, timber frame construction
-
Architectural office
MHM Ziviltechniker GmbH, 1010 VIENNA (AT)
-
Client
Ed. Züblin AG - ZÜBLIN Timber Division, 86551 Aichach