Photo of an office building in Wolfsburg. Timber frame construction with striking red façade.
Photo of an office building in Wolfsburg. Timber frame construction with striking red façade. © ZÜBLIN Timber

Client:
Behling Bauboulevard Wolfsburg GmbH

Years of construction:
2014/2015

Location:
Wolfsburg

Back to Projects

Office building, Wolfsburg

In order to realize a sustainable location concept, a new office building was built for the p3 Group in Schlosserstraße in Wolfsburg. The building comprises 3 floors with an area of 5,700 m² per floor. The building consists of a 1,870 m² timber frame construction. The timber stud walls were produced completely in the factory ready for assembly. The special feature of the design is the point-fixed glass construction.

Impressions

  • Our services
    • Statics, planning
    • Production, delivery and assembly
  • Products used

    Timber stud construction, facade

  • Architectural office

    Khs. Architects, Wolfsburg

  • Engineering office

    m+p Ingenieurgesellschaft mbH

  • Building owner

    Behling Bauboulevard Wolfsburg GmbH

  • Client

    Ed. ZÜBLIN AG, Hanover