Exterior shot of the Paul-Klee-Gymnasium in Gersthofen. You can see a large building.
Exterior shot of the Paul-Klee-Gymnasium in Gersthofen. You can see a large building. © Laura Reichert

Client:
Landratsamt Augsburg

Construction time timber construction:
11/2021 - 4/2022

Total construction time:
5/2021 - 1/2023

Location:
86368 Gersthofen

Back to Projects

Paul-Klee-Gymnasium, Gersthofen

A new campus is being built for the Paul-Klee-Gymnasium in Gersthofen near Augsburg. The school building will consist of three connected cubes, each with three storeys. A triple sports hall is also being built on the campus. The building ensemble is planned as a timber hybrid construction, which will save a considerable amount of CO2 compared to conventional construction methods or bind it in the building materials.
The columns and beams are made of renewable wood-based materials, the wood-concrete composite ceilings of LENO® cross laminated timber, board stack elements and concrete.

The contract for ZÜBLIN Timber also includes the production and assembly of the roof elements made of LENO® cross laminated timber and the approx. 1,800m2 of exterior walls in timber frame construction. ZÜBLIN Timber is cladding the exterior façade of the school and the sports hall with a ventilated fiber cement façade.

Impressions

  • Our services
    • Workshop planning
    • Manufacture, delivery and assembly of the wooden elements
  • Products used

    Wooden columns and beams made of beech laminated veneer lumber, wood-concrete composite ceilings made of LENO® cross laminated timber, board stacking elements as acoustic elements in wood-concrete composite ceiling design

  • Architectural office

    BKS & Partner Architekten Bauer Reichert PartGmbB, Munich

  • Engineering office

    Structural design PIRMIN JUNG Deutschland GmbH, Augsburg