Client:
Landeshauptstadt Erfurt
Total construction time:
12/2020 - 9/2022
Location:
99094 Erfurt
School, Erfurt
As the main contractor, ZÜBLIN carried out the turnkey extension to Thuringian Community School 6 in Erfurt-Hochheim. A distinctive feature of the new building is the MOLENO® modular timber-hybrid construction method developed by ZÜBLIN. The state capital, Erfurt, opted for this construction concept partly due to the anticipated benefits in terms of construction time and scheduling. In particular, completion on schedule and the rapid availability of the premises for school operations played a key role in this decision.
The load-bearing external walls of the building were constructed using LENO® cross-laminated timber.
German press
Impressions
Production and assembly
-
Our services
- Production and delivery of wall elements up to the façade membrane
- MOLENO® building system
-
Products used
LENO® cross laminated timber, LENO®-ADD
-
Client
ZÜBLIN Directorate East, Jena
-
Architectural office
HKS Architects, Erfurt
-
Engineering office
TBK, Stuttgart
-
Building owner
State capital Erfurt