Location | 68159 Mannheim, Germany |
Year of Construction | 9/2021-1/2022 |
Architect - B9.1 | Kränzle + Fischer-Wasels Architekten BDA PartGmbH, Karlsruhe |
Structural engineering - B9.1 | Brauch Ingenieure GmbH, Heidelberg |
Client | BPD Immobilienentwicklung GmbH |
General contractor | Ed. Züblin AG, Karlsruhe Division, Mannheim Area |
Products | Wood hybrid construction: load-bearing structure (ceilings, columns, staircases) are made of reinforced concrete, wood frame walls and façade construction |
Services | production and assembly |
Building Type | Multi-Storey |