Aquatics Centre, London

Foto ©Hufton+Crow
Foto ©Hufton+Crow
Foto ©Hufton+Crow
Location London, UK
Year of Construction 2010 - 2011
Architect Zaha Hadid Architects, London (UK)
Client Balfour Beatty Group Limited, London (UK)
Engineer ARUP Group Limited, London (UK)
Products Laminate Veneer Lumber (LVL), Façade
Services Structural Design, Shop drawings, Manufacturing, Installation
Contract value approx. 8,35 mio €