Aquatics Centre, London
Location | London, UK |
Year of Construction | 2010 - 2011 |
Architect | Zaha Hadid Architects, London (UK) |
Client | Balfour Beatty Group Limited, London (UK) |
Engineer | ARUP Group Limited, London (UK) |
Products | Laminate Veneer Lumber (LVL), Façade |
Services | Structural Design, Shop drawings, Manufacturing, Installation |
Contract value | approx. 8,35 mio € |